This manual describes the setting of a yurt. For pitching we use a single centre pole. Even though this manual basically describes the steps to pitch a TORTUGA yurt the steps to pitch TROLL or RAINBOW are roughly the same. In particular we here describe the setting of a [http://www.jurtenland.de/shop/Jurte-600-cm-komplett-KD-38 standard yurt with a diameter of 6m and a sidewall height of 1,65m]. Higher yurts or the supersize yurt can be set up, too, following this manual analogously. | |||
This manual describes the setting of a yurt. For pitching we use a single centre pole. Even though this manual basically describes the steps to pitch a TORTUGA yurt the steps to pitch TROLL or RAINBOW are roughly the same. In particular we here describe the setting of a standard yurt with a diameter of 6m and a sidewall height of 1,65m. Higher yurts or the supersize yurt can be set up, too, following this manual analogously. | |||
==Material needed== | ==Material needed== | ||
*1 roof tarp or 2 half roof tarps or 6 kota panels | *1 roof tarp or 2 half roof tarps or 6 kota panels | ||
| Zeile 9: | Zeile 8: | ||
*12(16) tent pegs (stakes) | *12(16) tent pegs (stakes) | ||
*2 ropes (6m and 3m) | *2 ropes (6m and 3m) | ||
*12 5 50 cords | *12 "5 50" cords | ||
*1 pulley | *1 pulley | ||
*1 centre pole (approx. 4,1m) | *1 centre pole (approx. 4,1m) | ||
The brackets show the required numbers for the supersize yurt. Instead of the chain you can also use a yurt cross. The pulley is optional and only to ease the setting up. | The brackets show the required numbers for the supersize yurt. Instead of the chain you can also use a yurt cross. The pulley is optional and only to ease the setting up. | ||
==Lay out the roof== | ==Lay out the roof== | ||
Lay the roof tarp outside up, exactly where you want have the yurt pitched (Half tarps or kota panels need to be lashed beforehand). The more accurate you lay out, the more stabile the yurt will stand later. The tarp should now show a regular dodecagon (hexadecagon for the supersize yurt). | Lay the roof tarp outside up, exactly where you want have the yurt pitched (Half tarps or kota panels need to be lashed beforehand). The more accurate you lay out, the more stabile the yurt will stand later. The tarp should now show a regular dodecagon (hexadecagon for the supersize yurt). | ||
| Zeile 70: | Zeile 69: | ||
Ensure that the cords are not tangled, otherwise you‘d have trouble trying reach them from the outside once the roof is pulled up again. | Ensure that the cords are not tangled, otherwise you‘d have trouble trying reach them from the outside once the roof is pulled up again. | ||
Finally you tie the cords to the anchor lines (taut line hitch) and tighen them. You may have to test which | Finally you tie the cords to the anchor lines (taut line hitch) and tighen them. You may have to test which guy line is the right one. Usually it‘s every second cord but this may differ according to the fabric. | ||