Pitching a yurt: Unterschied zwischen den Versionen

Zur Navigation springen Zur Suche springen
Keine Änderung der Größe ,  vor 12 Jahren
Zeile 9: Zeile 9:
*12(16) tent pegs (stakes)
*12(16) tent pegs (stakes)
*2 ropes (6m and 3m)   
*2 ropes (6m and 3m)   
*12 5 50 cords
*12 "5 50" cords
*1 pulley   
*1 pulley   
*1 centre pole (approx. 4,1m)
*1 centre pole (approx. 4,1m)
The brackets  show the required numbers for the supersize yurt. Instead of the chain you can also use a yurt cross. The pulley is optional and only to ease the setting up.
The brackets  show the required numbers for the supersize yurt. Instead of the chain you can also use a yurt cross. The pulley is optional and only to ease the setting up.
 
 
==Lay out the roof==  
==Lay out the roof==  
Lay the roof tarp outside up, exactly where you want have the yurt pitched (Half tarps or kota panels need to be lashed beforehand). The more accurate you lay out, the more stabile the yurt will stand later. The tarp should now show a regular dodecagon (hexadecagon for the supersize yurt).
Lay the roof tarp outside up, exactly where you want have the yurt pitched (Half tarps or kota panels need to be lashed beforehand). The more accurate you lay out, the more stabile the yurt will stand later. The tarp should now show a regular dodecagon (hexadecagon for the supersize yurt).
10

Bearbeitungen

Navigationsmenü