Anleitung Jurten-Abdeckplane/en: Unterschied zwischen den Versionen

Die Seite wurde neu angelegt: „Ensure at least one segment of the tarpaulin overlaps when secured. You can also lay the fabric on the Jurte roof for optimal rain protection. The tarpaulin can be moved aside anytime to allow smoke to escape and be closed again later.“
(Die Seite wurde neu angelegt: „Attach each of the eight cords to the respective guy lines with a tension knot. It's a matter of trial and error to find the right ones; theoretically, every second guy line is used, but this depends on how the fabric falls and how the tarpaulin can be pulled.“)
(Die Seite wurde neu angelegt: „Ensure at least one segment of the tarpaulin overlaps when secured. You can also lay the fabric on the Jurte roof for optimal rain protection. The tarpaulin can be moved aside anytime to allow smoke to escape and be closed again later.“)
Zeile 48: Zeile 48:
</div>
</div>


<div lang="de" dir="ltr" class="mw-content-ltr">
Ensure at least one segment of the tarpaulin overlaps when secured. You can also lay the fabric on the Jurte roof for optimal rain protection. The tarpaulin can be moved aside anytime to allow smoke to escape and be closed again later.
Zum Schluss sollte auf jeden Fall ein Segment der Jurtenabdeckplane überlappend abgespannt sein. Das siehst du in diesem Bild am besten an den Schüren, die paarweise nach unten gehen.
</div>


<div lang="de" dir="ltr" class="mw-content-ltr">
<div lang="de" dir="ltr" class="mw-content-ltr">
19.641

Bearbeitungen